The first row of pictures are at the start of the project. Tiles removed from floor and walls, ceiling removed to fit new insulation.
This was a bathroom renovation where the entire room was gutted including the ceiling. Insulation was installed into the ceiling and reboarded then plastered. The sanitaryware was all removed and the floor also. Electric under-floor heating was installed and a new tiled floor. New radiator, extractor and all new sanitary ware were fitted. New tiling installed with new surrounds around the window to match. The toilet was tidied so that you can't see the soil pipe and is now all easy wipe clean for the customer.